Saturday, March 25, 2006

Progress

The construction phase of the restaurant is moving along. The shell of the bar is in, floors are finished, drop ceilings are in progress, and the kitchen equipment arrives Monday. Part of our deal with the city of Ann Arbor over the historic context of the building included a restoration of the original Mayer-Scharer sign over the front door. It arrived yesterday and I was amazed. It is very cool, and very very large. I took a walk on my lunch break and counted that I could still see the sign from about 4 - 5 blocks away. I can't wait to see it at night all lit up. I have completed the first 5 days of hiring and I feel pretty confident about the types of applicants so far. It is a good feeling to know that we are creating 100 new jobs. Sometimes the look on an applicant's face when I offer them a position is enough to make me smile all day.
Cheers